Every abbreviation and acronym of the industrial world — automation, fieldbuses, functional safety, ATEX, OT/IT cybersecurity, AI, networking, process and sustainability. Instant search by acronym or keyword.

139 acronyms defined · 11 categories

Automation 14

APC Advanced Process Control

Advanced process control. Includes MPC, complex cascades, real-time optimization. A layer above DCS.

CMMS Computerized Maintenance Management System

Maintenance management software (SAP PM, Maximo, Coswin). Work order tracking, preventive plans, history.

DCS Distributed Control System

Distributed control system for continuous, I/O-heavy processes. Redundant architecture, integrated engineering.

ERP Enterprise Resource Planning

Enterprise management information system (SAP, Oracle, Microsoft Dynamics). Purdue level 5.

HMI Human-Machine Interface

Operator interface — panel, screen or web. ISA-101 best practice: gray dominant, color reserved for abnormal.

IED Intelligent Electronic Device

Protection relay or intelligent electronic device in electrical substations. Target of IEC 61850.

IIoT Industrial Internet of Things

Industrial Internet of Things: connected sensors, edge computing, cloud platforms, MQTT Sparkplug, OPC UA.

MES Manufacturing Execution System

Manufacturing execution system between ERP and DCS/PLC. Traceability, scheduling, recipe management (ISA-95).

MPC Model Predictive Control

Predictive control based on a dynamic process model. Anticipates and optimizes over an N-step horizon.

OEE Overall Equipment Effectiveness

Universal productivity KPI = Availability × Performance × Quality.

PID Proportional-Integral-Derivative

Classic feedback controller combining three terms (proportional, integral, derivative) for control loops.

PLC Programmable Logic Controller

Industrial automation controller with deterministic scan cycle and IEC 61131-3 languages (LD, FBD, ST, SFC). Core of discrete automation.

RTU Remote Terminal Unit

Remote telemetry and control unit using DNP3 or IEC 60870-5. Typical in wide-area SCADA networks.

SCADA Supervisory Control and Data Acquisition

Wide-area supervision and acquisition (water, energy, gas, rail). Remote RTU/PLC polling, historian, alarm management.

Buses & protocols 14

APL Advanced Physical Layer (Ethernet-APL)

Two-wire Ethernet + power physical layer for ATEX zone 0/1. Natural successor of PROFIBUS PA / FF H1.

AS-i Actuator Sensor Interface

Low-cost binary bus for on/off sensors and actuators. Yellow flat vampire-tap cable, mixed power and signal.

CAN Controller Area Network

Differential serial bus originally for automotive (Bosch 1986). Foundation of industrial CANopen and DeviceNet.

DNP3 Distributed Network Protocol 3

Dominant North American SCADA protocol for electricity and water. IEEE 1815. RTU-side time-stamping, event classes.

EtherCAT Ethernet for Control Automation Technology

Ultra-fast Industrial Ethernet (Beckhoff/ETG). On-the-fly circulating frame, <100 µs latency. High-performance motion control.

FF H1 Foundation Fieldbus H1

Two-wire process bus (FieldComm) for ATEX zone 1 instrumentation. Direct competitor of PROFIBUS PA.

HART Highway Addressable Remote Transducer

Protocol overlaying digital signal on the analog 4-20 mA loop. Sensor configuration without changing wiring.

Modbus Modbus protocol

Grandfather of industrial protocols (Modicon, 1979). RTU (serial) and TCP (IP) variants. Universal and simple.

MQTT Message Queuing Telemetry Transport

Ultra-light publish/subscribe protocol. Industrial Sparkplug B variant for IIoT cloud (auto-discovery, rich metadata).

OPC UA OPC Unified Architecture

IT/OT interoperability standard (IEC 62541). Rich information model, native security (Sign + Encrypt + X.509).

PROFIBUS Process Field Bus

RS-485 serial bus. DP version (Decentralized Periphery) for distributed I/O, PA version for ATEX process instrumentation.

PROFINET Process Field Net

Deterministic Industrial Ethernet driven by Siemens / PI. Dominant in Europe. Classes: Standard, RT, IRT.

TSN Time-Sensitive Networking

Set of Ethernet extensions (IEEE 802.1) making standard Ethernet deterministic. Convergence layer of future buses.

Functional safety 20

BMS Burner Management System

Burner management system — safe ignition sequence, flame supervision, fault shutdown. NFPA 85, EN 12952/12953.

DC Diagnostic Coverage

Diagnostic Coverage. Fraction of dangerous failures detected by automatic internal diagnostics.

ESD Emergency Shutdown

Emergency shutdown of a process. ESD system = SIS dedicated to rapid shutdown to safe state.

FIT Failure In Time

Failures per 10⁹ hours. Standard unit on component datasheets.

FMECA Failure Mode, Effects and Criticality Analysis

Systematic analysis of failure modes, their effects and their criticality. Risk analysis tool.

HAZOP Hazard and Operability Study

Systematic study of hazards and operability. Word-by-word analysis (More, Less, No, Reverse…) of deviations.

HFT Hardware Fault Tolerance

Hardware Fault Tolerance. HFT = 1: the function is preserved despite one failure (1oo2, 1oo2D, 2oo3 architectures).

LOPA Layer of Protection Analysis

Layer of Protection Analysis. Quantifies risk reduction by each IPL (Independent Protection Layer) to derive required SIL.

MOC Management of Change

Management of Change. Formal process to track, assess and approve any safety-impacting change. IEC 61511 requirement.

MTBF Mean Time Between Failures

Mean Time Between Failures. MTBF (h) = 10⁹ / FIT. Statistical — does not guarantee individual lifetime.

MTTR Mean Time To Repair

Mean Time To Repair. Directly affects PFD (shorter MTTR reduces simultaneous unavailability probability).

PFD Probability of Failure on Demand

Probability of failure on demand (low-demand mode). SIL 2: 10⁻³ ≤ PFD < 10⁻². See also PFDavg.

PFDavg Average Probability of Failure on Demand

PFD averaged over the proof-test interval T1. IEC 61508 reference metric in low-demand mode.

PFH Probability of dangerous Failure per Hour

Probability of dangerous failure per hour (high-demand / continuous mode). SIL 2: 10⁻⁷ ≤ PFH < 10⁻⁶.

RRF Risk Reduction Factor

Risk Reduction Factor = 1 / PFD. How much the safety function divides the residual risk.

SFF Safe Failure Fraction

Safe Failure Fraction = (λSU + λSD + λDD) / λtot. Share of safe or detected failures.

SFRT Safety Function Response Time

Total response time of the safety function — sensor to actuator in safe state. Must be shorter than the process safety time.

SIF Safety Instrumented Function

Safety Instrumented Function — a specific safe-state action (e.g. burner trip on flame failure).

SIL Safety Integrity Level

Safety Integrity Level (IEC 61508 / 61511). 4 levels: SIL 1 (lowest) to SIL 4 (most stringent).

SIS Safety Instrumented System

Safety Instrumented System. Sensors + logic solver + final elements realising one or more SIFs.

ATEX / Ex 10

AIT Auto-Ignition Temperature

Auto-ignition temperature. Temperature at which a mixture self-ignites without spark. Basis of T1-T6 classes.

ATEX ATmosphères EXplosibles

European regulatory framework for explosive atmospheres. Directive 2014/34/EU (equipment) + 99/92/EC (workplaces).

EPL Equipment Protection Level

Equipment Protection Level. Ma/Mb (mining), Ga/Gb/Gc (gas), Da/Db/Dc (dust). Determines permitted zone.

IECEx IEC System for Certification of Explosive Atmospheres

IEC international scheme. Mutual recognition of Ex certifications between test labs (ExTL) and certification bodies (ExCB).

IK Impact Protection (IEC 62262)

Mechanical impact resistance rating. IK00 (none) to IK10 (20 J). Complements IP.

IP Ingress Protection (IEC 60529)

Ingress Protection rating. Two digits: 1st = solids (0-6), 2nd = liquids (0-9). E.g. IP65 = dust-tight + water jets.

IS Intrinsic Safety

Intrinsic safety (Ex i, IEC 60079-11). Energy in the circuit limited below ignition threshold even on fault.

LEL Lower Explosive Limit

Lower Explosive Limit. Minimum fuel concentration in air below which no explosion is possible.

MIE Minimum Ignition Energy

Minimum Ignition Energy of a gas/air or dust/air mixture. Hydrogen: ~0.02 mJ; methane: ~0.28 mJ.

UEL Upper Explosive Limit

Upper Explosive Limit. Maximum concentration above which the mixture is too rich to explode.

Cybersecurity 21

ANSSI Agence nationale de la sécurité des systèmes d'information

French national cybersecurity authority. EBIOS RM framework, PASSI/PDIS qualifications, OIV oversight.

CRA Cyber Resilience Act

EU regulation on products with digital elements. Applicable end 2027. Security-by-design, 5 years of updates.

DORA Digital Operational Resilience Act

EU Regulation 2022/2554. Digital operational resilience for the financial sector. Applicable since Jan 2025.

EDR Endpoint Detection and Response

Successor of antivirus. Endpoint agent, behavioural analysis, MITRE ATT&CK detection. CrowdStrike, SentinelOne, Microsoft Defender.

IACS Industrial Automation and Control System

Official IEC 62443 term for industrial automation and control system as a whole.

IAM Identity and Access Management

Identity and Access Management. Okta, Microsoft Entra (formerly Azure AD), Ping. SSO, MFA, entitlement governance.

ICS Industrial Control System

Industrial Control System — generic term covering PLC, DCS, SCADA. Near-synonym of IACS.

IDS Intrusion Detection System

Intrusion detection system. In OT, passive sensors (Dragos, Nozomi, Claroty CTD) analysing ICS traffic.

IT Information Technology

Enterprise IT — workstations, servers, cloud, applications, data. Distinct from OT.

MFA Multi-Factor Authentication

Multi-factor authentication: something I know + something I have + something I am. TOTP, FIDO2, badges.

NDR Network Detection and Response

Detection and response based on network traffic analysis (vs EDR on endpoints). Essential in OT.

NIS2 Network and Information Security Directive 2

EU Directive 2022/2555. Cybersecurity for essential and important entities. Transposed Oct 2024. Fines up to €10M or 2% turnover.

OT Operational Technology

Operational Technology — PLCs, DCS, SCADA, sensors. As opposed to IT (information technology).

PAM Privileged Access Management

Privileged Access Management. Password vault + recorded sessions. CyberArk, Wallix, BeyondTrust, Thycotic.

PKI Public Key Infrastructure

Public Key Infrastructure. Generates, signs and manages X.509 certificates. Microsoft AD CS, HashiCorp Vault, EJBCA.

RGPD Règlement Général sur la Protection des Données (GDPR)

EU Regulation 2016/679. Personal data protection. Fines up to 4% of global turnover or €20M.

SIEM Security Information and Event Management

Security log collection and correlation. Splunk, Microsoft Sentinel, Elastic, Wazuh, Graylog.

SOAR Security Orchestration, Automation and Response

Security orchestration and automated incident response. Palo Alto XSOAR, Splunk SOAR, Tines.

SOC Security Operations Center

Security Operations Center. Human team + SIEM/SOAR/EDR tools running 24/7 to detect and respond.

SSO Single Sign-On

Single Sign-On. One authentication grants access to multiple applications. SAML, OIDC, Kerberos.

XDR Extended Detection and Response

Extended EDR aggregating endpoint + network + cloud + email for unified correlation.

AI 12

AI Artificial Intelligence

Artificial intelligence. Includes machine learning, deep learning, generative AI, symbolic expert systems.

DL Deep Learning

Deep Learning. ML based on multi-layer neural networks. Vision, NLP, audio.

EU AI Act EU Artificial Intelligence Act

EU Regulation 2024/1689. First worldwide AI regulatory framework. Risk-based (unacceptable / high / limited / minimal).

GenAI Generative AI

Generative AI. Capable of producing original content (text, code, image, diagram). Used industrially for PLC copilots.

GPAI General-Purpose AI

General-Purpose AI. Category defined by the EU AI Act for models with broad capabilities (mainly LLMs). Specific obligations.

LLM Large Language Model

Large Language Model. GPT, Claude, Gemini, Mistral, Llama. Foundation of copilots and GenAI.

ML Machine Learning

Machine Learning. Statistical models that learn from data rather than being explicitly programmed.

MLOps Machine Learning Operations

DevOps for ML. Model lifecycle: training, edge deployment, monitoring, drift detection, retraining.

NIST AI RMF NIST AI Risk Management Framework

NIST AI Risk Management Framework. 4 functions: Govern, Map, Measure, Manage. Published January 2023.

NLP Natural Language Processing

Natural Language Processing. Extraction, classification, text generation. Foundation of LLMs.

ONNX Open Neural Network Exchange

Open ML model exchange format. Lets you deploy a PyTorch/TensorFlow-trained model on any ONNX runtime (edge included).

RAG Retrieval Augmented Generation

Pattern combining an LLM with an indexed document base. Model queries the base before answering. Reduces hallucinations.

Network 11

APN Access Point Name

Cellular access point name. A private APN separates corporate mobile traffic from Internet — direct egress to group VPN.

BGP Border Gateway Protocol

Inter-domain routing protocol of the Internet. Exchanges routes between autonomous systems (AS).

DMZ Demilitarized Zone

Demilitarized Zone. Intermediate subnet between IT and OT. Purdue level 3.5: proxy, jump server, NDR sensors.

MPLS Multiprotocol Label Switching

Label switching used by telco operators. SLA-guaranteed, stable latency. Expensive.

NAT Network Address Translation

Network Address Translation. Lets multiple private hosts share a single public IP.

SD-WAN Software-Defined WAN

Software-defined WAN. Aggregates MPLS, Internet, 4G/5G with automatic failover. Cisco Viptela, Fortinet, Versa.

TCP Transmission Control Protocol

Reliable transport protocol of the Internet. Connection, ordering, retransmission. Base of OPC UA, Modbus TCP, HTTPS.

UDP User Datagram Protocol

Connectionless Internet transport protocol. Lightweight, no delivery guarantee. Used by DNS, SNMP, optional MQTT.

VLAN Virtual Local Area Network

Virtual LAN. Logical segmentation on a switch (IEEE 802.1Q). Does NOT replace a firewall for security.

VPN Virtual Private Network

Encrypted tunnel between two networks or user and network. IPsec, OpenVPN, WireGuard, SSL VPN.

ZTNA Zero Trust Network Access

Zero Trust Network Access. VPN successor — continuous verification of every access, regardless of perimeter.

Process 8

BPCS Basic Process Control System

Basic Process Control System (vs SIS). Standard DCS or PLC. IEC 61511 §3.2.13.

FAT Factory Acceptance Test

Factory Acceptance Test. System testing at the manufacturer before delivery. Paired with on-site SAT.

P&ID Piping and Instrumentation Diagram

Piping and Instrumentation Diagram. Shows equipment, lines, instruments, valves. ISO 10628, ISA-5.1.

PFD (procédé) Process Flow Diagram

Process Flow Diagram. Simplified diagram showing major equipment and flows. NOT to be confused with safety PFD.

PHA Process Hazard Analysis

Process Hazard Analysis. Includes HAZOP, what-if, LOPA. Regulatory requirement (OSHA PSM, Seveso).

PRV Pressure Relief Valve

Pressure Relief Valve (progressive opening). Often used interchangeably with PSV.

PSV Pressure Safety Valve

Pressure Safety Valve (pop-action). Overpressure protection. ASME VIII, EN ISO 4126.

SAT Site Acceptance Test

Site Acceptance Test. Final verification after installation and connection, before commissioning.

Project 11

CE Conformité Européenne

CE marking. Conformity with European directives for market placement. Self-declaration by manufacturer.

DRP Disaster Recovery Plan

Disaster Recovery Plan. Technical procedures to restore service after major incident. Complements the BCP.

GLP Good Laboratory Practice

Good Laboratory Practice. OECD framework for regulated laboratory studies.

GMP Good Manufacturing Practice

Good Manufacturing Practice. Mandatory pharma framework (EU GMP, US FDA 21 CFR Part 211, 21 CFR Part 11 on electronic records).

KPI Key Performance Indicator

Key Performance Indicator. Quantitative measure for steering and evaluation.

MVP Minimum Viable Product

Minimum Viable Product. Simplest version already delivering value, to be enriched later.

OEM Original Equipment Manufacturer

Original Equipment Manufacturer. Designer and builder of an equipment, vs integrators or resellers.

POC Proof of Concept

Proof of concept. Small-scale prototype demonstrating that a technical idea works, before full deployment.

PoT Proof of Test

Backtest on historical data. Before a live POC, validation on 12-24 months of past data.

SLA Service Level Agreement

Service Level Agreement. Contractual commitment on service quality (availability, response time).

UKCA UK Conformity Assessed

Post-Brexit marking for the UK market (England, Wales, Scotland). Coexists with CE for Northern Ireland.

Sustainability 12

CBAM Carbon Border Adjustment Mechanism

Carbon Border Adjustment Mechanism. Reporting since Oct 2023, payment from 2026. Steel, aluminium, cement, fertilizers, H₂, electricity.

CCUS Carbon Capture, Utilization and Storage

Carbon capture, utilization and storage. Post-combustion, oxy-fuel, geological sequestration, valorization (e-fuels, carbonation).

CEE Certificats d'Économies d'Énergie

French white certificates scheme. Obligation on energy suppliers. Funds 10-80% of eligible energy efficiency projects.

CSRD Corporate Sustainability Reporting Directive

EU Directive 2022/2464. Mandatory sustainability reporting for ~50,000 EU companies from 2024.

EED Energy Efficiency Directive

EU Directive 2023/1791 (recast). EU target 11.7% energy consumption reduction by 2030. Mandatory audit for large companies.

EnPI Energy Performance Indicator

Energy Performance Indicator. Normalized metric for energy efficiency monitoring (ISO 50006). E.g. kWh/tonne produced.

ESG Environmental, Social, Governance

Environmental, Social and Governance criteria used by investors for sustainability assessment.

ESRS European Sustainability Reporting Standards

European Sustainability Reporting Standards. 12 standards adopted by Delegated Regulation 2023/2772 under CSRD.

EU ETS EU Emissions Trading System

EU Emissions Trading System. CO₂ market for installations >20 MW thermal. Current price ~€80/tCO₂.

GHG Greenhouse Gas Protocol

International carbon accounting framework. Defines scopes 1, 2, 3 used worldwide for GHG reporting.

PPA Power Purchase Agreement

Long-term Power Purchase Agreement (10-20 yr) with a renewable producer. Locks price and guarantees of origin.

SBTi Science Based Targets initiative

Voluntary initiative validating that corporate emission reduction trajectories are +1.5 °C-aligned. SDA methodology.

Economics 6

CAPEX Capital Expenditure

Capital expenditure: money spent once to acquire a durable asset (machines, controllers, construction). Depreciated over its life.

LCOE Levelized Cost of Energy

Levelized cost of energy: average cost of an MWh over a plant's whole life (CAPEX + OPEX). Compares solar, wind, gas, nuclear on one basis.

OPEX Operational Expenditure

Operational expenditure: money spent continuously to run an asset (energy, maintenance, staff, consumables). Recurring.

ROI Return On Investment

Return on investment: gain relative to the outlay, as a percentage. With payback time, it judges a project's profitability.

TCO Total Cost of Ownership

Total cost of ownership across the full life cycle: purchase, operation, maintenance, end of life. The real basis to compare two solutions.

TOTEX Total Expenditure

Total expenditure = CAPEX + OPEX. A neutral view between buying and operating, used notably in regulated network industries.