<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <channel>
    <title>IndustryHub — Articles</title>
    <link>https://industryhub.site/en/articles</link>
    <description>IndustryHub articles on industrial engineering.</description>
    <language>en</language>
    <lastBuildDate>Mon, 12 Oct 2026 00:00:00 GMT</lastBuildDate>
    <atom:link href="https://industryhub.site/en/rss.xml" rel="self" type="application/rss+xml" />
    <item>
      <title>Machinery Regulation (EU) 2023/1230: changes, advantages and drawbacks</title>
      <link>https://industryhub.site/en/articles/reglement-machines-2023-1230-avantages-inconvenients</link>
      <guid isPermaLink="true">https://industryhub.site/en/articles/reglement-machines-2023-1230-avantages-inconvenients</guid>
      <pubDate>Mon, 12 Oct 2026 00:00:00 GMT</pubDate>
      <description>The Machinery Regulation has already been corrected once and amended twice. An assessment based on the consolidated version of 27 July 2026: what the July 2026 amendment changes for artificial intelligence, the Directive versus Regulation table, the advantages, the drawbacks, who gains and who pays, cybersecurity and the amendment still pending.</description>
      <dc:creator>IndustryHub</dc:creator>
      <category>reglement-machines</category>
      <category>directive-2006-42-ce</category>
      <category>version-consolidee</category>
      <category>intelligence-artificielle</category>
      <category>cybersecurite</category>
      <category>normes-harmonisees</category>
      <category>organisme-notifie</category>
      <category>modification-substantielle</category>
    </item>
    <item>
      <title>Machinery Regulation (EU) 2023/1230: what changes on 20 January 2027</title>
      <link>https://industryhub.site/en/articles/reglement-machines-2023-1230-ce-qui-change-2027</link>
      <guid isPermaLink="true">https://industryhub.site/en/articles/reglement-machines-2023-1230-ce-qui-change-2027</guid>
      <pubDate>Fri, 09 Oct 2026 00:00:00 GMT</pubDate>
      <description>On 20 January 2027, Regulation (EU) 2023/1230 replaces Machinery Directive 2006/42/EC, with no overlap period. Timeline, six categories of machinery that require a notified body, substantial modification, cybersecurity and machine learning, digital instructions, harmonised standards, the Swiss case, and an action plan to be ready.</description>
      <dc:creator>IndustryHub</dc:creator>
      <category>reglement-machines</category>
      <category>directive-2006-42-ce</category>
      <category>marquage-ce</category>
      <category>evaluation-de-conformite</category>
      <category>modification-substantielle</category>
      <category>cybersecurite</category>
      <category>apprentissage-automatique</category>
      <category>notice-numerique</category>
    </item>
    <item>
      <title>Digitalising the company in the age of AI: stakes, data protection and competitiveness</title>
      <link>https://industryhub.site/en/articles/digitalisation-entreprise-ia-donnees-competitivite</link>
      <guid isPermaLink="true">https://industryhub.site/en/articles/digitalisation-entreprise-ia-donnees-competitivite</guid>
      <pubDate>Wed, 07 Oct 2026 00:00:00 GMT</pubDate>
      <description>AI is already inside the company, often through personal accounts. What it changes for digitalisation: where the data goes, what GDPR, the AI Act, the Data Act and NIS2 require, how to stay free of your supplier, and why a competitive gain has to be measured. A three-step grid: understand, build, decide.</description>
      <dc:creator>IndustryHub</dc:creator>
      <category>digitalisation</category>
      <category>protection-des-donnees</category>
      <category>rgpd</category>
      <category>eu-ai-act</category>
      <category>data-act</category>
      <category>nis2</category>
      <category>shadow-ai</category>
      <category>souverainete</category>
      <category>competitivite</category>
    </item>
    <item>
      <title>IEC 61511: functional safety for the process industries — SIS, LOPA, prior use and the separation trap</title>
      <link>https://industryhub.site/en/articles/securite-fonctionnelle-iec-61511</link>
      <guid isPermaLink="true">https://industryhub.site/en/articles/securite-fonctionnelle-iec-61511</guid>
      <pubDate>Sun, 14 Jun 2026 00:00:00 GMT</pubDate>
      <description>IEC 61511 applies IEC 61508 to the process industries, from the operator&apos;s point of view. It governs the safety instrumented system (SIS) lifecycle: BPCS/SIS separation, SIL determination by risk graph and LOPA, prior use, proof testing, functional safety assessment (FSA). Stakes, difficulties, mistakes to avoid and good practice.</description>
      <dc:creator>IndustryHub</dc:creator>
      <category>iec-61511</category>
      <category>sis</category>
      <category>sif</category>
      <category>sil</category>
      <category>lopa</category>
      <category>risk-graph</category>
      <category>prior-use</category>
      <category>proof-test</category>
      <category>bpcs</category>
    </item>
    <item>
      <title>ISO 26262: automotive functional safety — ASIL, HARA, decomposition and SOTIF for ADAS</title>
      <link>https://industryhub.site/en/articles/securite-fonctionnelle-iso-26262</link>
      <guid isPermaLink="true">https://industryhub.site/en/articles/securite-fonctionnelle-iso-26262</guid>
      <pubDate>Sun, 14 Jun 2026 00:00:00 GMT</pubDate>
      <description>ISO 26262 applies IEC 61508 to the electrical and electronic systems of road vehicles. ASIL levels (QM, A-D) determined by HARA (severity, exposure, controllability), the V-model, hardware metrics (SPFM, LFM, PMHF), ASIL decomposition, SEooC, and the complementary role of SOTIF (ISO 21448) for ADAS and autonomy. Stakes, mistakes, good practice.</description>
      <dc:creator>IndustryHub</dc:creator>
      <category>iso-26262</category>
      <category>asil</category>
      <category>hara</category>
      <category>sotif</category>
      <category>iso-21448</category>
      <category>pmhf</category>
      <category>automobile</category>
      <category>adas</category>
    </item>
    <item>
      <title>IEC 62061 &amp; ISO 13849: functional safety for machinery — SIL or PL, categories, and which standard to choose</title>
      <link>https://industryhub.site/en/articles/securite-fonctionnelle-machines-62061-13849</link>
      <guid isPermaLink="true">https://industryhub.site/en/articles/securite-fonctionnelle-machines-62061-13849</guid>
      <pubDate>Sun, 14 Jun 2026 00:00:00 GMT</pubDate>
      <description>For machinery safety, two standards coexist: ISO 13849 (Performance Level PL, all technologies) and IEC 62061 (SIL, derived from IEC 61508). Architecture categories, MTTFd, DCavg, CCF, PFHd, PL↔SIL correspondence, convergence of the two standards and the Machinery Regulation 2023/1230. How to choose, mistakes to avoid, good practice.</description>
      <dc:creator>IndustryHub</dc:creator>
      <category>iso-13849</category>
      <category>iec-62061</category>
      <category>performance-level</category>
      <category>sil</category>
      <category>categorie</category>
      <category>mttfd</category>
      <category>pfhd</category>
      <category>machines</category>
    </item>
    <item>
      <title>SIL &amp; explosion protection: when an instrumented measure becomes the explosion barrier (TRGS 725, EN 50495, IEC 61511)</title>
      <link>https://industryhub.site/en/articles/sil-et-explosionsschutz</link>
      <guid isPermaLink="true">https://industryhub.site/en/articles/sil-et-explosionsschutz</guid>
      <pubDate>Sun, 14 Jun 2026 00:00:00 GMT</pubDate>
      <description>Explosion protection (ATEX) and functional safety (SIL) meet the moment an instrumented measure is the barrier that prevents the explosive atmosphere or the ignition source. TRGS 725 and EN 50495 define that bridge: classification by risk graph, SIL, and the IEC 61511 lifecycle. Example: over-temperature → Safe Torque Off of a motor.</description>
      <dc:creator>IndustryHub</dc:creator>
      <category>explosionsschutz</category>
      <category>atex</category>
      <category>sil</category>
      <category>trgs-725</category>
      <category>en-50495</category>
      <category>sto</category>
      <category>msr</category>
      <category>iec-61511</category>
      <category>epl</category>
    </item>
    <item>
      <title>Functional safety and IEC 61508: the parent standard — why, how, and the pitfalls</title>
      <link>https://industryhub.site/en/articles/securite-fonctionnelle-iec-61508</link>
      <guid isPermaLink="true">https://industryhub.site/en/articles/securite-fonctionnelle-iec-61508</guid>
      <pubDate>Thu, 28 May 2026 00:00:00 GMT</pubDate>
      <description>Functional safety guarantees that a safety function achieves AND maintains a demonstrable level of risk reduction. An introduction to IEC 61508: SIL, the safety lifecycle, random and systematic failures, HFT/SFF architectural constraints, PFD/PFH metrics, the stakes, the real difficulties, mistakes to avoid and good practice.</description>
      <dc:creator>IndustryHub</dc:creator>
      <category>iec-61508</category>
      <category>sil</category>
      <category>safety-lifecycle</category>
      <category>pfd</category>
      <category>pfh</category>
      <category>sff</category>
      <category>hft</category>
      <category>sis</category>
      <category>e-e-pe</category>
    </item>
    <item>
      <title>AI in industry: stakes, challenges and real pitfalls — beyond the hype</title>
      <link>https://industryhub.site/en/articles/ia-industrie-enjeux-defis</link>
      <guid isPermaLink="true">https://industryhub.site/en/articles/ia-industrie-enjeux-defis</guid>
      <pubDate>Fri, 22 May 2026 00:00:00 GMT</pubDate>
      <description>Why the majority of industrial AI PoCs never reach production. The 6 structural challenges (data, brownfield, models, MLOps, cybersecurity, ROI), the applicable EU AI Act timeline, ISO/IEC 42001, and what public failures (GE Predix, IBM Watson Health) teach us.</description>
      <dc:creator>IndustryHub</dc:creator>
      <category>eu-ai-act</category>
      <category>iso-42001</category>
      <category>mlops</category>
      <category>maintenance-predictive</category>
      <category>vision-industrielle</category>
      <category>gen-ai</category>
      <category>ge-predix</category>
      <category>brownfield</category>
    </item>
    <item>
      <title>Exchanging data between 2 PLCs on different IP ranges — the OT-compliant approach</title>
      <link>https://industryhub.site/en/articles/echange-data-2-automates-ot</link>
      <guid isPermaLink="true">https://industryhub.site/en/articles/echange-data-2-automates-ot</guid>
      <pubDate>Thu, 15 Jan 2026 00:00:00 GMT</pubDate>
      <description>Real-world case with 2 S7-1500F CPUs, SCALANCE SC, PN/PN Coupler and an industrial DMZ. How to link 2 sensitive infrastructures while respecting Purdue, IEC 62443 and NIS2.</description>
      <dc:creator>IndustryHub</dc:creator>
      <category>siemens</category>
      <category>s7-1500</category>
      <category>scalance</category>
      <category>profinet</category>
      <category>opc-ua</category>
      <category>segmentation</category>
      <category>purdue</category>
      <category>iec-62443</category>
    </item>
  </channel>
</rss>
